Home   »   Portfolio   »   Hotels & Resorts   »   Nikko Bali

Nikko Bali


Nikko Bali Hotel
Nikko Bali Hotel, Bali
Mechanical, Electrical, Fire and Hydraulic design, Documentation & Construction Phase Services

Commencement Date: Start Design 1992
Completion Date: Finish Construction 1996
Client: PT. Caterison Sukses
Developer: PT. Caterison Sukses
Architect: Wimberley Alison Tong & Gou / PT. Airmas Asri
Builder: Multiplex / PT. Widjaya Kasuma
Capital Value: $85 million
Building Owner: PT. Caterison Sukses

The Nikko Bali Hotel is a 4-Star Resort Hotel consisting of five separate buildings, incorporating a total of 436 guest rooms, three restaurants, two bars, a health spa, conference facilities, swimming pools, water features and extensive landscaping.

Operated by Japanese Airlines (JAL), the hotel is located in Sawangan Bali and is constructed on the cliff face overlooking the Pacific Ocean.

Floth Sustainable Building Consultants provided Mechanical, Electrical, Fire and Hydraulic design, documentation and construction phase services utilsing resources from both their Sydney and Jakarta offices.

When the hotel was built in 1993/94, public infrastructure in Bali was limited and the site was not serviced with the basic utilities of electricity, water and sewerage, which required the hotel to be largely self sufficient.

In order to provide reliable electricity supply to the site, a prime power generation plant was implemented incorporating 4 × 1250kVA diesel generators operating in a fully automatic unattended mode. The installation included a total of 270,000 litres of diesel fuel storage which provided 30 days operation at 100 percent occupancy rate. This was combined together with extensive acoustic treatment due to the close proximity of the generators to the guest rooms and the ball room.

The inclusion of a prime power station provided ideal opportunities to improve energy efficiency through the implementation of co-generation principles, whereby waste heat from the engines was utilised for the purpose of hot water heating and pre-heating feed water to the steam boilers.

The provision of a reliable water supply to the hotel also presented its own particular challenges, with both bore and sea water sources examined in some detail before being discounted in favor of an extension to the utility mains. Bore water on the site provided to be both scarce (unreliable) and highly saline, whilst the intensive power requirements associated with desalination (reverse osmosis) proved to be cost prohibitive.

In addition a sewerage treatment plant was incorporated in the design with effluent treated to a level whereby it could be utilized for irrigation of the extensive landscaped areas.

Sydney

Ph:  +61 2 9419 4100
Fax: +61 2 9411 8460

Email: syd@floth.com.au

Brisbane

Ph:  +61 7 3513 8000
Fax: +61 7 3252 2499

Email: bne@floth.com.au

Melbourne

Ph:  +61 3 9448 8755

Email: mel@floth.com.au

Perth

Ph:  +61 8 6162 2396

Email: perth@floth.com.au

Jakarta

Ph:  +62 21 719 1044
Fax: +62 21 719 7812

Email: floth@flothindonesia.com